Projects

8.5 MWp; Aster Medcity

Categories: Industrial
Capacity: 8.5 MWp
Location: Kerala

About the Project

Aster Medicity is a leading hospital chain in India. Aster opted for  a 8.5 MWp ground mount solar to reduce its operational costs and  carbon footprint.

U-Solar was able to understand their requirements and tailor a  clean energy pathway for their energy transition over the state.

8.5 MWp; Aster Medcity

About the Project Aster Medicity is a leading hospital chain...

17 MWp; Shree Cement

Categories: Industrial
Capacity: 17 MWp
Location: Chhattisgarh

About the project

Shree Cement, being one among the main players in the Indian Cement industry decided to reduce their carbon footprint by embracing clean energy for their operations.

U-Solar designed and executed a Solar Project of 17 MWp using latest cutting-edge technology, which ensures maximum production and ROI on their investments.

17 MWp; Shree Cement

About the project Shree Cement, being one among the main...

3.5 MWp; Madura Coats

Categories: Industrial
Capacity: 3.5 MWp
Location: Tamil Nadu

About The Project

Madura Coats, one of the large-scale textile manufactures in South India partnered with U-Solar to reduce their energy bills by adopting solar energy.

A total of 3.5 MWp Rooftop Solar capacity was commissioned in two phases, which brought down the energy bills significantly which reflected as an excellent Return of Investment.

3.5 MWp; Madura Coats

About The Project Madura Coats, one of the large-scale textile...

Installation Map

Loading...
Number Of Projects: 0 PRINT

    Store Direction

    GET DIRECTIONS

    Use my location to find the closest Service Provider near me

    Description

    Get Started with Solar
    Download the U-Solar Brochure!

    Get In Touch

    Pioneers in customized solar system integration

    Design and engineering team work on the O&M

    14+ years of solar plant execution in all segments

    Why choose clean energy?

    a. United Nations Sustainable Development Goal (SDG) #7 – Clean and affordable energy access to all.

    b. Contribute significantly towards Govt. of India’s targets for rooftop solar by 2022.

    Adopt a solar power plant without investment

    Why use solar energy?

    Join Our Team

    Allowed Type(s): .pdf, .doc, .docx